Pulsafeeder Chem-Tech Series XP TIMER EN Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Bombas Pulsafeeder Chem-Tech Series XP TIMER EN. Pulsafeeder Chem-Tech Series XP TIMER EN User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 20
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
REV. A PN J63143 - 1 -
XP Peristaltic Pump Installation, Operation
and Maintenance Manual
7 Day Electronic Timer
Tested and Certified by WQA
against NSF/ANSI 61-Section 8.
and CSA B483.1
Vista de página 0
1 2 3 4 5 6 ... 19 20

Resumo do Conteúdo

Página 1 - Tested and Certified by WQA

REV. A PN J63143 - 1 - XP Peristaltic Pump Installation, Operation and Maintenance Manual 7 Day Electroni

Página 2 - TABLE OF CONTENTS

REV. A PN J63143 - 10 - 12. Skip cycle button; ‘ may be used when you want to skip all program sequences pro

Página 3 - 2. Safety Instructions

REV. A PN J63143 - 11 - 5.2. General DANGER: DO NOT ATTEMPT TO FEED CHEMICALS WITHOUT FIRST CONSULTING YOUR

Página 4 - 3. Technical Specifications

REV. A PN J63143 - 12 - 6.1. Tubing Assembly Removal Always wear protective clothing and safety glasses when

Página 5 - 4. Installation

REV. A PN J63143 - 13 - 5) Remove pump head tube assembly by removing both connector fittings and pulling tub

Página 6 - 5. Operation

REV. A PN J63143 - 14 - Figure 9a: Rotor Alignment at Start of Tube Installation 3) Insert one connector en

Página 7

REV. A PN J63143 - 15 - Figure 9c: Finishing the New Tube Installation 6) Using the mode selector switch

Página 8

REV. A PN J63143 - 16 - 7. Policies and Procedures 7.1. Manufacturers Product Warranty PULSAFEEDER warrants

Página 9

REV. A PN J63143 - 17 - All material must be returned freight prepaid. All merchandise must be properly packa

Página 10 - PROGRAM WORKSHEET

REV. A PN J63143 - 18 - Appendix I. Pump Assembly and Wiring Diagram

Página 11 - 6. Maintenance

REV. A PN J63143 - 19 - Maintenance Record Date Maintenance Performed

Página 12 - 6.1. Tubing Assembly Removal

REV. A PN J63143 - 2 - TABLE OF CONTENTS 1. Introduction...

Página 13

REV. A PN J63143 - 20 - EC Declaration of Conformity We, Pulsafeeder Inc., declare under sole responsibilit

Página 14

REV. A PN J63143 - 3 - 1. Introduction Thank you for your purchase of the Chem-Tech Series XP peristaltic pum

Página 15 - 6.3. Pools and Spas

REV. A PN J63143 - 4 - • WARNING: All pumps are factory tested with water. Remove tubing and thoroughly dry i

Página 16 - 7. Policies and Procedures

REV. A PN J63143 - 5 - Figure 2: Injector Placement Vertical Mount Horizontal Figure 1: Pump Dimensions 4.

Página 17 - 7.3. Credits

REV. A PN J63143 - 6 - 4) Apply Pipe tape to the injection fitting threads and install into piping system. Do

Página 18 - Appendix

REV. A PN J63143 - 7 - Figure 6 As previously mentioned the mode selector switch has three

Página 19 - Maintenance Record

REV. A PN J63143 - 8 - PUMP TIMER PROGRAMMING INSTRUCTIONS 1. Read all instructions first. 2. When programm

Página 20

REV. A PN J63143 - 9 - 3. Slide the programming selector switch to center, ‘RUN’ position to check time

Comentários a estes Manuais

Sem comentários